Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Cobourg Hosts Midtown Creek Flood Control Public Meeting
Dredging

January 23, 2018 · about 8 years ago

Cobourg Hosts Midtown Creek Flood Control Public Meeting

The Town of Cobourg will host a public information meeting for the Midtown Creek Flood Control Ponding Area and Kerr Street Extension to Division Street West to the railway spur, Class Environmental Assessment (EA). The town is conducting a Municipal Class Environmental Assessment (Class EA) study t

2 minutes read
  • LinkedIn
  • X
  • Email

The Town of Cobourg will host a public information meeting for the Midtown Creek Flood Control Ponding Area and Kerr Street Extension to Division Street West to the railway spur, Class Environmental Assessment (EA).

The town is conducting a Municipal Class Environmental Assessment (Class EA) study to assess the available measures for providing flood protection for structures upstream of the existing railway corridor that crosses Midtown Creek.

The study is being carried out in accordance with the planning and design process for Schedule ‘C’ projects as outlined in the Municipal Class Environmental Assessment (October 2000, as amended in 2007), which is approved under the Ontario Environmental Assessment Act.

The 1st mandatory PIC held on November 29, 2017 presented the problem statement, alternative solutions to the problem statement, and identified the preferred solution which completed Phases 1 and 2 of the EA process.

Currently, the study is at the conclusion of Phase 3 of the EA process where the design alternatives have been evaluated and a preferred design concept has been identified for public comment.

Upon the successful completion of Phase 3, an Environmental Study Report (ESR) will be prepared and made available for public review and comment. It is expected this study will be completed during the winter of 2017/2018 and the preferred design alternative will go to construction in the summer of 2018.

The public meeting will be held on Thursday, January 25 from 5 until 7 pm in the Cameco ‘C’ Room at the Cobourg Community Center (CCC) at 750 D’Arcy Street.

[mappress mapid=”24793″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free