Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Glendale Narrows Removal Project up for Comment
Dredging

January 25, 2018 · about 8 years ago

Glendale Narrows Removal Project up for Comment

The U.S. Army Corps of Engineers has announced the availability of a draft Environmental Assessment for the Los Angeles River Channel at Glendale Narrows – Reach 5C and Reach 6A Accumulated Material Removal Project. The proposed project entails removal of approximately 40,000 cubic yards of accumula

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers has announced the availability of a draft Environmental Assessment for the Los Angeles River Channel at Glendale Narrows – Reach 5C and Reach 6A Accumulated Material Removal Project.

The proposed project entails removal of approximately 40,000 cubic yards of accumulated material (sediment, cobbles, and boulders) from Reach 5C and a portion of Reach 6A.

The Proposed Project Area is located in the Glendale Narrows section of the Los Angeles River within the vicinity of the Fletcher Drive Bridge and the Glendale Freeway Bridge in the City of Los Angeles, Los Angeles County.

The approximately 2,000 foot long Proposed Project Area starts downstream of the Fletcher Drive bridge and terminates approximately 900 feet downstream of the Glendale Freeway.

An engineering review of the Glendale Narrows section of the Los Angeles River in 2016 to assess the flood conveyance capacity identified Reach 5C and Reach 6A as critical areas where flood conveyance capacity has been reduced.

A bend in the river at Reach 5C and 6A has resulted in formation of a large sandbar against the left bank, reducing the conveyance capacity from the designed 78,000 cubic foot per second (cfs) to approximately 43,500 cfs. Removal of the accumulated material would partially restore the conveyance capacity to approximately 54,000 cfs.

The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this proposed project. Comments will be accepted from January 24, 2018 to February 24, 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free