Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Cashman/Dutra JV Wins Boston Harbor Dredging Contract
Business & Finance

February 19, 2018 · about 8 years ago

Cashman/Dutra JV Wins Boston Harbor Dredging Contract

The Joint Venture comprising of Cashman Dredging Inc. and Dutra Group was awarded last week a $122.2 million Boston Harbor dredging contract. According to FedBizOpps, the project includes dredging of approximately 11,700,000 cubic yards of silt, blue clay, till and weathered rock from the harbor are

2 minutes read
  • LinkedIn
  • X
  • Email

The Joint Venture comprising of Cashman Dredging Inc. and Dutra Group was awarded last week a $122.2 million Boston Harbor dredging contract.

According to FedBizOpps , the project includes dredging of approximately 11,700,000 cubic yards of silt, blue clay, till and weathered rock from the harbor area.

The Federal Navigation Project for Boston Harbor consists of the following components: deepening and widening the Broad Sound North Channel to -51 feet Mean Lower, Low Water (MLLW), deepening and widening the Main Ship Channel (MSC) to the Conley Terminal including the turning basin or “MSC Notch” to -47 feet MLLW, deepening the President Roads Anchorage and deepening the lower Reserved Channel to -47 feet MLLW.

The improvement depths noted above are required to be an additional two feet deep in areas of hard material like till and weathered rock.

The Army Corps reported that the material dredged to create the federal navigation project improvements will be placed at the Massachusetts Bay Disposal Site (MBDS) approximately 20 miles offshore of Boston Harbor with the exception of a small fraction of the material being placed as a cap to the Main Ship Channel Confined Aquatic Disposal cell, just downstream of the inner confluence of the Chelsea and Mystic Rivers.

The contractor will be required to bring equipment to accomplish all dredging by mechanical means for the material types previously noted with strength characteristics less than fast rock. Dredging operations will be permitted 24 hours per day and 7 days per week and are expected to take up to 3½ years to complete, said USACE.

[mappress mapid=”24885″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free