Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Florida ICWW Dredging Plan Introduced
Dredging

September 12, 2018 · about 8 years ago

Florida ICWW Dredging Plan Introduced

The Florida Inland Navigation District will be receiving sealed bids for the construction of the Intracoastal Waterway Maintenance Dredging project at its offices in Jupiter, Florida until 2 PM, October 4, and then the bids will be publicly opened. “The District will award the project to the qualifi

1 minutes read
  • LinkedIn
  • X
  • Email

The Florida Inland Navigation District will be receiving sealed bids for the construction of the Intracoastal Waterway Maintenance Dredging project at its offices in Jupiter, Florida until 2 PM, October 4, and then the bids will be publicly opened.

“The District will award the project to the qualified, responsible, and responsive bidder presenting the lowest bid, ” they said in its release.

The base project generally entails dredging approximately 90,000 CY of material from ±4.5 miles of the Intracoastal Waterway (ICWW) between the Port of Palm Beach to the Town of Palm Beach Docks to a depth of -12 feet Mean Lower Low Water, (MLLW).

In accordance with permit conditions, material should be dredged via the use of either a mechanical or hydraulic dredge to remove all material from the dredge template. Dredged material should be offloaded at a District-owned ±17-acre dredged material management area (DMMA) located on the north end of Peanut Island.

The Alternate Bid Item includes the removal and disposal of a 5-inch AT&T abandoned conduit that lies within the Intracoastal Waterway channel bottom.

The successful Bidder will have 180 days from the Notice to Proceed to complete the entire project, according to the release.

The District will hold a mandatory pre-bid meeting at 11:00 AM, September 20, at the project site.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free