Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Funding Secured for Port Mansfield Dredge Project
Dredging

September 13, 2018 · about 8 years ago

Funding Secured for Port Mansfield Dredge Project

The U.S. Army Corps of Engineers, Galveston District has received funding to conduct maintenance dredging at the Channel to Port Mansfield navigation project. This navigation project consists of a 15-ft deep (Low Water Datum) by 125-ft wide by 12.9 mile long shallow-draft channel, which extends from

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Galveston District has received funding to conduct maintenance dredging at the Channel to Port Mansfield navigation project.

This navigation project consists of a 15-ft deep (Low Water Datum) by 125-ft wide by 12.9 mile long shallow-draft channel, which extends from the Gulf of Mexico; through a jetted inlet to a turning basin at Port Mansfield, Texas.

The Channel was not included within the President’s budget for Fiscal Year 2019, however congress has provided supplemental funding to be used for maintenance dredging in Fiscal Year 2019.

Since 2000, the Channel has been dredged through 5 separate contracts, typically utilizing supplemental funding set aside in response to coastal storm impacts.

This supplemental funding will be used, through multiple contracts, to dredge the Channel to Port Mansfield to its authorized depth. The first contract will provide an 8 foot channel from the Gulf Intracoastal Waterway (GIWW) Intersection to the Port Mansfield main basin to relieve critical shoaling and is anticipated to begin as early as fall of 2018, reported the Corps.

“ The additional contracts will include dredging the entrance and main channels of Channel to Port Mansfield to authorized dimensions in conjunction with environmental windows. ” said Ashton Burgin, operations manager at USACE Galveston District. “ This work will likely commence in fall of 2019 and conclude by March 2020, or sooner .”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free