Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›Aqualis Offshore completes Egina FPSO position keeping ops
FPSO

September 19, 2018 · about 8 years ago

Aqualis Offshore completes Egina FPSO position keeping ops

Aqualis Offshore has completed its position keeping role for the Egina FPSO which is now moored in Nigerian waters.

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore marine and engineering consultancy Aqualis Offshore has completed its position keeping role for the Egina FPSO which is now moored in Nigerian waters.

Aqualis said on Tuesday that the team of position keeping masters on board the FPSO first oversaw the installation of the four first mooring lines, which took the FPSO to storm safe condition.

The team then continued their role for the installation of four further mooring lines. In total, the Egina FPSO is now spread moored on 16 mooring lines (4×4).

The company delivered the position keeping work as a subcontractor to EPCIC contractor for the FPSO, Samsung Heavy Industries (SHI).

It is worth mentioning that Aqualis Offshore was awarded the position keeping role for the installation of the Egina FPSO back in early August .

When operational, Egina, the largest FPSO in Total’s fleet, will be producing 200,000 barrels per day, increasing Nigeria’s daily production by 10 percent..

Phil Lenox , director of Asia Pacific for Aqualis Offshore, said: “The entire position keeping job and installation of the first eight mooring lines was completed safely and on schedule.”

The FPSO is 330 meters long, with 61 meters across and 34 meters high, with a storage capacity of 2.3 million barrels of oil. The FPSO will be moored at the Total-operated Egina oil field, located some 130 kilometers off the coast of Nigeria at water depths of more than 1,500 meters.

When operational, Egina, the largest FPSO in Total’s fleet, will be producing 200,000 barrels per day, increasing Nigeria’s daily production by 10 percent.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free