Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›PHOTO: TSHD Magdalen Returns to Long Beach Island
Dredging

September 21, 2018 · about 8 years ago

PHOTO: TSHD Magdalen Returns to Long Beach Island

After nearly two weeks of severe weather, the dredger Magdalen returned to Long Beach Island, NJ, yesterday to resume dredging and beachfill work, the U.S. Army Corps of Engineers’ Philadelphia District said in their latest announcement. The twin-screw trailing suction hopper dredger (TSHD) is owned

1 minutes read
  • LinkedIn
  • X
  • Email

After nearly two weeks of severe weather, the dredger Magdalen returned to Long Beach Island, NJ, yesterday to resume dredging and beachfill work, the U.S. Army Corps of Engineers’ Philadelphia District said in their latest announcement.

The twin-screw trailing suction hopper dredger (TSHD) is owned and operated by Weeks Marine Inc.

The Magdalen is one of the two newest, and among the largest, hopper dredges in the U.S. She is self-propelled and will bring formidable pumping power to off-load beach quality sand or other materials for land reclamation.

The dune and berm project is designed to reduce the risk of storm damages to homes, businesses and infrastructure.

USACE awarded a contract to Weeks to repair and renourish the three sections of the project that were constructed prior to Hurricane Sandy: Harvey Cedars, Surf City and a section of Brant Beach in Long Beach Township.

The contract calls for the dredging, pumping and placement of sand as well as dune repairs; crossovers and sand fencing repairs; and dune grass plantings. Beaches will be constructed from 100 feet to 300 feet wide in front of the dune system.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free