Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE, Ecology: Chehalis River Plans on the Table
Dredging

October 1, 2018 · about 8 years ago

USACE, Ecology: Chehalis River Plans on the Table

To reduce flood risks in the state’s second-largest river system, the Chehalis River Basin Flood Control Zone District is proposing to construct a new floodwater retention structure on the Chehalis River near the town of Pe Ell in Lewis County. The district also is seeking to raise the current levee

2 minutes read
  • LinkedIn
  • X
  • Email

To reduce flood risks in the state’s second-largest river system, the Chehalis River Basin Flood Control Zone District is proposing to construct a new floodwater retention structure on the Chehalis River near the town of Pe Ell in Lewis County.

The district also is seeking to raise the current levee at the Chehalis-Centralia Airport, including elevating part of Airport Road and making other improvements.

Since the proposal is likely to adversely affect the environment, the Washington Department of Ecology and U.S. Army Corps of Engineers (USACE) are seeking public comment to help the agencies define what should be studied in the environmental review for the proposed flood-damage reduction project.

Under the proposal, the Chehalis River would flow normally through the structure except during major floods, when the facility could be operated to hold up to 65,000 acre feet of floodwaters in a temporary reservoir. The water would be released back to the river system as soon as it was safe to do so.

The two agencies are leading separate environmental reviews of the district’s proposal but are holding a joint scoping period to make it easier for the public to submit comments. The agencies have established a project website with information about the scoping process, public meetings, how to submit comments, and other information about the environmental review process.

Ecology is using the State Environmental Policy Act to evaluate the proposal while the USACE is conducting its environmental review under the National Environmental Policy Act. Each agency will develop a separate environmental impact statement (EIS) to assess the project.

In mid-October, USACE and Ecology will conduct two open house-style public meetings to gather comments:

Both agencies will accept public comments through October 29.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free