Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Port of Everett Finally Gets Its Dredge Permit
Dredging

October 16, 2018 · about 8 years ago

Port of Everett Finally Gets Its Dredge Permit

Last month, after nearly 9 years of scientific studies and regulatory work with state and federal agencies, the Port of Everett received its marina maintenance dredging permit for the South and Central docks. The permit was issued based on a unique scientific study, called a bioaccumulation study, t

2 minutes read
  • LinkedIn
  • X
  • Email

Last month, after nearly 9 years of scientific studies and regulatory work with state and federal agencies, the Port of Everett received its marina maintenance dredging permit for the South and Central docks.

The permit was issued based on a unique scientific study, called a bioaccumulation study, that demonstrated the dredge material is environmentally acceptable for placement at the Port Gardner Bay open water dredge material disposal site.

The permit was extremely important because without it, dredging the marina would be cost prohibitive – seeing a price tag increase from roughly $5 million to $50 million for conducting one round of maintenance dredging within the South and Central Marinas, reported the Port.

There are 10 separate open water disposal sites located throughout Washington State that have been used since the 1980s to provide a safe and cost-effective place to put navigation dredge material. They are managed by the Dredged Material Management Program .

According to the Port, this program exists to facilitate navigation and maritime commerce, while guaranteeing protection of Washington’s aquatic environment. The sites are all located in deep water – selected by state and federal agencies because at these depths there is much less biological activity than in shallower areas.

In Port Gardner Bay, the site sits in water that is more than 500-ft deep. While the Port and other agencies have relied on these open water disposal sites for decades, recent policies by the state and federal permitting agencies have made the testing parameters and methods more stringent and science based.

The Port of Everett worked with the agencies for years within the new policies and went through a rigorous scientific process to ultimately obtain this highly important open water suitability determination for the Port’s marina dredge spoils.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free