Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›McDermott in Floating Production Unit FEED for Scarborough Field
Operations & Maintenance

February 5, 2019 · about 7 years ago

McDermott in Floating Production Unit FEED for Scarborough Field

McDermott has secured a front-end engineering and design contract by Woodside Energy for a floating production unit (FPU) for the Scarborough field gas development in Western Australia. McDermott’s center of excellence in the Hague, the Netherlands, will lead the study and early engineering. Upon co

2 minutes read
  • LinkedIn
  • X
  • Email

McDermott has secured a front-end engineering and design contract by Woodside Energy for a floating production unit (FPU) for the Scarborough field gas development in Western Australia.

McDermott’s center of excellence in the Hague, the Netherlands, will lead the study and early engineering. Upon completion, the contract includes the option to progress to an engineering, procurement, construction and installation (EPCI) contract should the project be approved for full development by Woodside and its Scarborough joint venture partners.

“ Woodside is a key customer of our company, and it is therefore outstanding to see such an important project leveraging off McDermott’s global capabilities, ” said Ian Prescott , McDermott’s senior vice president for Asia Pacific. “In partnering with Woodside on the front-end engineering and design study, we will use our best-in-class engineering know-how and project execution expertise to ensure successful delivery of the project.”

The FPU processes natural gas, which includes gas separation, dehydration and compression as well as Mono Ethylene Glycol (MEG) regeneration and water handling. The topside will be designed for a production capacity of 7-9 metric tons per annum and will be placed on a semi-submersible hull in 2,952 feet (900 meters) water depth. The FPU will be remotely operated and minimally manned.

The Scarborough gas field is located approximately 236 miles (380 kilometers) off the Burrup Peninsula in the Northwestern Shelf of Australia and contains 7.3 trillion cubic feet of natural gas reserves.

The development covers 12 daisy-chained subsea wells to be tied back to a semisubmersible FPU located at the Scarborough field, with onshore processing on the Burrup Peninsula.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago