Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Equinor Deploys Sonardyne Technology at Johan Sverdrup
Equipment

February 26, 2019 · about 7 years ago

Equinor Deploys Sonardyne Technology at Johan Sverdrup

Equinor plans to deploy cabled subsea instrumentation from Sonardyne International to help increase the accuracy of time-lapse seismic data at the Johan Sverdrup oil field. From first production at the development, Equinor plans to use seafloor based seismic cable permanent reservoir monitoring (PRM

2 minutes read
  • LinkedIn
  • X
  • Email

Equinor plans to deploy cabled subsea instrumentation from Sonardyne International to help increase the accuracy of time-lapse seismic data at the Johan Sverdrup oil field.

From first production at the development, Equinor plans to use seafloor based seismic cable permanent reservoir monitoring (PRM) technology to observe what is happening in the reservoir over time to help maximize recovery rates.

Equinor has engaged subsea services contractor Subsea 7 to install a Sonardyne Pressure Inverted Echo Sounder (PIES) at 110 – 120 meter water depth at Johan Sverdrup.

PIES instruments continuously measure the two-way travel time of sound waves propagated through the water column from the seabed to the sea surface as well as the pressure (depth) at the seabed. This data is then used to calculate a continuous time history of average water velocity and tidal variation throughout the whole water column.

This will be only the second time where PIES units are hardwired into topside power and communication infrastructure, which means Equinor will have instant and continuous access to their data, the company explained.

Conventionally, PIES data is collected acoustically by a passing surface vessel, including unmanned surface vessels.

Shaun Dunn , global business manager for Exploration and Surveillance at Sonardyne, said, “Time-lapse seismic is a key tool to help operators optimize their recovery rates through improved reservoir visualization, modelling and eventually also predictive analytics. By using a PIES, Equinor will have higher repeatability in their seismic data which further supports proactive reservoir management.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

26 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

26 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

26 days ago