Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›BP kicks off gas production from Angelin development
News

February 27, 2019 · about 7 years ago

BP kicks off gas production from Angelin development

Oil and gas giant BP has produced first gas from its Angelin development offshore Trinidad and Tobago.

2 minutes read
  • LinkedIn
  • X
  • Email

Oil and gas giant BP has produced first gas from its Angelin development offshore Trinidad and Tobago.

BP said on Tuesday that its subsidiary BP Trinidad and Tobago (bpTT) achieved first gas from Angelin on time and under budget.

The Angelin development, originally discovered by the El Diablo well in 1995, includes a new platform and four wells. It is located 60 kilometers off the south-east coast of Trinidad in a water-depth of approximately 65 meters.

The new platform, which is BPTT’s 15th installation offshore Trinidad & Tobago, has a production capacity of 600 million standard cubic feet per day (mmscfd).

Gas flows from the platform to the existing Serrette hub via a new 21-kilometer pipeline. Production from Serrette is tied into bpTT’s Cassia B hub via a 26-inch diameter, 32-mile long pipeline.

Production from this facility supplies the domestic market and Atlantic LNG’s liquefaction plant for export as LNG to international markets, such as the US and Europe.

BPTT regional president Claire Fitzpatrick said that Angelin is the next step in the company’s long-term development plan in Trinidad which could potentially include up to $8 billion of investment in several more major projects over the next ten years.

BP started up two new gas projects in Trinidad – Juniper and Trinidad Onshore Compression – in 2017 and recently announced the sanction of another two developments – Cassia Compression and Matapal – expected to come onstream in 2021 and 2022 respectively.

Angelin is BP’s third major upstream project start-up in 2019, following Constellation in the US Gulf of Mexico and the second stage of the West Nile Delta development offshore Egypt.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago