Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›TechnipFMC Lands Tortue Ahmeyim FPSO Deal with BP
Operations & Maintenance

March 1, 2019 · about 7 years ago

TechnipFMC Lands Tortue Ahmeyim FPSO Deal with BP

TechnipFMC has secured a large contract from BP for the engineering, procurement, construction, installation and commissioning (EPCIC) of the floating production storage and offloading (FPSO) unit for the Greater Tortue Ahmeyim development. The Tortue/Ahmeyim development is located in the C-8 block

1 minutes read
  • LinkedIn
  • X
  • Email

TechnipFMC has secured a large contract from BP for the engineering, procurement, construction, installation and commissioning (EPCIC) of the floating production storage and offloading (FPSO) unit for the Greater Tortue Ahmeyim development.

The Tortue/Ahmeyim development is located in the C-8 block off the shore of Mauritania and the Saint-Louis Profond block offshore Senegal.

According to TechnipFMC, a large contract is valued between $500 million and $1 billion.

This award is a continuation to the FEED (front end engineering design) contract awarded in April 2018.

Nello Uccelletti , president of TechnipFMC’s Onshore/Offshore business, said: “We are honored to be entrusted with the execution of this prestigious contract in West Africa which is a testimonial to our long-term partnership with BP and our leadership in the gas monetization industry. This award is one of our strategic “early engagement” achievements, following the successful completion by TechnipFMC of the FEED study. We look forward to collaborating with BP to unlock the full potential of this important project.”

The initial subsea infrastructure connects the first four wells consolidated through production pipelines leading to this FPSO. From here liquids are removed and the export gas is transported via a pipeline to the LNG hub terminal where the gas is liquefied.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago