Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Johan Sverdrup safety and electrical facilities need improvement, PSA says
News

March 7, 2019 · about 7 years ago

Johan Sverdrup safety and electrical facilities need improvement, PSA says

The Petroleum Safety Authority (PSA) has found several improvement points during an audit of the Johan Sverdrup living quarters platform (LQ).

2 minutes read
  • LinkedIn
  • X
  • Email

The Petroleum Safety Authority (PSA) has found several improvement points during an audit of the Johan Sverdrup living quarters platform (LQ).

PSA said on Thursday that the audit, conducted on January 24, looked at how operator Equinor managed safety systems and electrical facilities on the Johan Sverdrup LQ.

According to the safety body, the objective of the audit was to verify that Equinor’s management and follow-up of safety systems and electrical facilities in connection with readying the LQ for operation complied with the authorities’ requirements.

The audit involved a presentation of experiences and statuses of completion of systems and facilities, outstanding work and any plans for work that needs to be performed offshore.

The PSA added that there was work still outstanding on certain safety systems and electrical facilities.

During the audit, the safety watchdog identified two improvement points regarding deficiencies in the storage of safety equipment for switchrooms and deficient reviewing of reference documents in electrotechnical analyses.

PSA told Equinor to report on how the improvement points would be addressed by April 1, 2019.

Johan Sverdrup

The giant Johan Sverdrup oil field in the North Sea offshore Norway is being developed in two phases.

The first phase involves the establishment of a field center consisting of four platforms, including a utility and living quarters platform, a processing platform, a drilling platform, and a riser platform, three subsea installations for water injection, power from shore, export pipeline for oil (Mongstad) and gas (Kårstø).

The platforms will be interlinked by gangways. This phase is expected to start production in November 2019.

The second phase covers the development of another processing platform, modifications of the riser platform and the field center, five subsea templates, in addition to power from shore to the Utsira High in 2022. Production start expected in the fourth quarter of 2022.

In recent project news, Boka Vanguard, the world’s largest heavy lift and transportation vessel, reached Norway last month after a two-month journey from South Korea carrying the Johan Sverdrup field processing platform topside.

Equinor is the operator of the Johan Sverdrup field with a 40.0267% interest, and its partners are Lundin Norway (22.6%), Petoro (17.36%), Aker BP (11.5733%), and Total (8.44%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago