Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Equinor gets safety nod for extended operation of Gullfaks C
Fossil Energy

March 8, 2019 · about 7 years ago

Equinor gets safety nod for extended operation of Gullfaks C

Norwegian oil and gas company Equinor has received consent from the country’s offshore safety agency to extend the life of the Gullfaks C platform and associated pipelines located offshore Norway. The Petroleum Safety Authority (PSA) said on Friday that Equinor had applied for consent to extend the

1 minutes read
  • LinkedIn
  • X
  • Email

Norwegian oil and gas company Equinor has received consent from the country’s offshore safety agency to extend the life of the Gullfaks C platform and associated pipelines located offshore Norway.

The Petroleum Safety Authority (PSA) said on Friday that Equinor had applied for consent to extend the operating life of Gullfaks C to June 30, 2036.

The consent for extended operating life is contingent on the operator having ascertained that the facilities, pipelines, and equipment are in a state that permits them to always be operated safely and in compliance with regulatory requirements.

The PSA found that Equinor had carried out the necessary assessments and investigations to ascertain this and the agency therefore gave Equinor the consent it applied for.

Equinor has already received a green light from the Norwegian Petroleum Directorate to using the C platform on the Gullfaks field until June 30, 2036.

Equinor is the operator of the Gullfaks field, which is situated in block 34/10 in the Tampen area of the northern North Sea. Gullfaks has been developed using three integrated processing, drilling and accommodation facilities with concrete jackets and steel decks (Gullfaks A, B, and C).

Gullfaks C was installed in May 1989 in waters that are 216 meters deep, and it started to produce on January 1, 1990. The design lifetime was 30 years.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free