Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Equinor gets safety nod for extended operation of Gullfaks C
News

March 8, 2019 · about 7 years ago

Equinor gets safety nod for extended operation of Gullfaks C

Norwegian oil and gas company Equinor has received consent from the country’s offshore safety agency to extend the life of the Gullfaks C platform and associated pipelines located offshore Norway. The Petroleum Safety Authority (PSA) said on Friday that Equinor had applied for consent to extend the

1 minutes read
  • LinkedIn
  • X
  • Email

Norwegian oil and gas company Equinor has received consent from the country’s offshore safety agency to extend the life of the Gullfaks C platform and associated pipelines located offshore Norway.

The Petroleum Safety Authority (PSA) said on Friday that Equinor had applied for consent to extend the operating life of Gullfaks C to June 30, 2036.

The consent for extended operating life is contingent on the operator having ascertained that the facilities, pipelines, and equipment are in a state that permits them to always be operated safely and in compliance with regulatory requirements.

The PSA found that Equinor had carried out the necessary assessments and investigations to ascertain this and the agency therefore gave Equinor the consent it applied for.

Equinor has already received a green light from the Norwegian Petroleum Directorate to using the C platform on the Gullfaks field until June 30, 2036.

Equinor is the operator of the Gullfaks field, which is situated in block 34/10 in the Tampen area of the northern North Sea. Gullfaks has been developed using three integrated processing, drilling and accommodation facilities with concrete jackets and steel decks (Gullfaks A, B, and C).

Gullfaks C was installed in May 1989 in waters that are 216 meters deep, and it started to produce on January 1, 1990. The design lifetime was 30 years.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago