Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›TechnipFMC Lands Subsea Deal for Johan Sverdrup Development
Equipment

March 20, 2019 · about 7 years ago

TechnipFMC Lands Subsea Deal for Johan Sverdrup Development

TechnipFMC has secured a subsea contract, worth between $75 million and $250 million, by Equinor for the Johan Sverdrup Phase 2 development, located in the Norwegian sector of the North Sea. The contract covers the delivery and installation of the subsea production system including integrated templa

1 minutes read
  • LinkedIn
  • X
  • Email

TechnipFMC has secured a subsea contract, worth between $75 million and $250 million, by Equinor for the Johan Sverdrup Phase 2 development, located in the Norwegian sector of the North Sea.

The contract covers the delivery and installation of the subsea production system including integrated template structures, manifolds, tie-in and controls equipment.

According to Equinor, the production system consists of five templates and a total of 18 X-mas trees with associated components.

Arnaud Piéton , president Subsea at TechnipFMC, said: “We have collaborated closely with Equinor establishing a Strategic Collaboration Agreement in 2018. This joint engagement is leading to further value creation for both of us and for Equinor’s Johan Sverdrup Phase 2 development. It reaches beyond the supply of subsea equipment, now encompassing its installation. We are very proud of this joint engagement and very pleased to work alongside Equinor for the Johan Sverdrup Phase 2 development.”

Plans call for the Johan Sverdrup field to start up in November this year, Equinor noted.

The contracts are subject to approval of the plan for development and operation (PDO) for Johan Sverdrup Phase 2, which was submitted to the authorities in August 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago