Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Gazprom completes TurkStream offshore-nearshore sections
News

March 21, 2019 · about 7 years ago

Gazprom completes TurkStream offshore-nearshore sections

Russian giant Gazprom said that the final weld that connects the offshore and the nearshore sections of TurkStream was completed, marking the finalization of the entire pipeline system in the Black Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

Russian giant Gazprom said that the final weld that connects the offshore and the nearshore sections of TurkStream was completed, marking the finalization of the entire pipeline system in the Black Sea.

The procedure, known technically as ‘Above Water Tie-In,’ involved retrieving the nearshore pipeline and offshore pipeline from the seabed, lifting them above water and welding them together. The total weight that had to be lifted for the operation was approximately 409 tons.

Following an inspection of the weld, the pipe was lowered to the seabed at a depth of 32 meters. This operation was carried out on both lines in Russian waters in January and February this year, and near the Turkish coast in March.

The pipelaying in deep waters was carried out by Pioneering Spirit, while the shallow-water pipelaying was conducted by Lorelay.

With the completion of the Above Water Tie-In procedure, a physical connection between the landfall facility near the Russian city of Anapa and the receiving terminal near Kiyikoy in Turkish Thrace is realized.

Russkaya Compressor Station, which will provide the necessary pressure for the gas to traverse through the Black Sea, and the Anapa landfall facility of the TurkStream pipeline system are already complete and on stand-by.

With the completion of the receiving terminal in Kiyikoy later this year, TurkStream will be ready to commence operations. Natural gas flow through TurkStream is planned to start by the end of 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago