Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Dunkirk LNG terminal reloading flow-rate increased
Clean Fuel

March 25, 2019 · about 7 years ago

Dunkirk LNG terminal reloading flow-rate increased

Dunkerque LNG the operator of France’s Dunkirk liquefied natural gas (LNG) import terminal said the facility has completed the upgrade of the maximum reloading flow-rate.

1 minutes read
  • LinkedIn
  • X
  • Email

Dunkerque LNG the operator of France’s Dunkirk liquefied natural gas (LNG) import terminal said the facility has completed the upgrade of the maximum reloading flow-rate.

The operator noted that the project became a necessity as soon as the terminal was commissioned.

The maximum reloading flow-rate has been raised from 4,000 cubic meters per hour to 8,800 cbm/hour which means the ships’ stopover time when reloading has been halved.

Juan Vazquez , general manager of Dunkerque LNG said, “reloading a tanker faster means less downtime for the ship and, therefore, major savings for our customers. With a flow-rate of 4,000 cbm per hour, it took 40 hours to reload a tanker. Now, at 8,800 cbm per hour, it only takes 20 hours.”

This new service required large-scale renovation work, the operator said, adding that eight pumps were replaced on tanks 1 and 2.

The increase in refueling speed also causes a rise in the gas vapor that must be recovered then treated before being sent to the gas transmission network.

“That is why we had to install an additional compressor; now we can process 48 tonnes of gas per hour instead of the previous rate of 30,” Vazquez said.

The tests designed to verify that the new equipment behaves properly have just been completed, Dunkerque LNG said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free