Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›FERC issues draft EIS for Jordan Cove LNG
News

April 1, 2019 · about 7 years ago

FERC issues draft EIS for Jordan Cove LNG

Jordan Cove LNG project led by the Canadian energy infrastructure company Pembina has been issued a draft environmental impact statement by the Federal Energy Regulatory Commission (FERC).

1 minutes read
  • LinkedIn
  • X
  • Email

Jordan Cove LNG project led by the Canadian energy infrastructure company Pembina has been issued a draft environmental impact statement by the Federal Energy Regulatory Commission (FERC).

FERC said in its notice that the draft EIS assesses the potential environmental effects of the construction and operation of the project in Coos County, Oregon.

“FERC staff concludes that approval of the project would result in a number of significant environmental impacts; however, the majority of impacts would be less than significant because of the impact avoidance, minimization, and mitigation measures proposed by Jordan Cove and Pacific Connector and those recommended by staff in the draft EIS,” the notice reads.

FERC invited for the public to submit comments on the draft EIS by July 5, 2019.

The $10 billion project in Coos County, Oregon has a planned capacity of 7.8 million ton per annum.

In early March, Stuart Taylor, senior vice president of marketing and new ventures at Pembina said the project has signed non-binding deals for 11 million tons of LNG per year.

Firm deals are expected to be signed in the coming months as the company is currently engaged in negotiations over the binding contract details.

A federal regulatory decision is expected by November 2019, with Pembina planning to produce first volumes from the facility in 2024.

LNG WOrld News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago