Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Shell calls it quits at Baltic LNG project
News

April 10, 2019 · about 7 years ago

Shell calls it quits at Baltic LNG project

The Hague-based LNG giant Shell has decided to drop out of the Gazprom-led Baltic liquefied natural gas project in the Leningrad region.

1 minutes read
  • LinkedIn
  • X
  • Email

The Hague-based LNG giant Shell has decided to drop out of the Gazprom-led Baltic liquefied natural gas project in the Leningrad region.

At the end of March Gazprom decided to integrate the Baltic LNG project with its gas processing plants in the Ust-Luga complex.

Speaking to Reuters, Cederic Cremers, chairman of Shell’s Russian unit said that following Gazprom’s decision on the final development concept for the Baltic LNG project Shell decided to step away from the project.

He added that additional projects Shell is developing with Gazprom have not been impacted by this decision. Shell remains a shareholder in Gazprom-led Sakhalin 2 LNG project, Russia’s first liquefied natural gas export facility.

To remind, Gazprom and RusGazDobycha have devised a plan that envisages the construction of capacities for the processing of 45 billion cubic meters of gas and for the production and shipping of 13 million tons of LNG, up to 4 million tons of ethane and over 2.2 million tons of liquefied petroleum gases (LPG) per year.

The complex will be processing ethane-containing gas produced by Gazprom from the Achimov and Valanginian deposits of the Nadym-Pur-Taz region, Gazprom said

The gas remaining after the processing (about 20 billion cubic meters) will go into the company’s gas transmission system.

It is expected to put the first train of the complex into operation in the second half of 2023 and the second train in late 2024.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago