Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Upgrading Motor Control Center Aboard Rohr-Idreco Dredger
Business & Finance

May 2, 2019 · about 7 years ago

Upgrading Motor Control Center Aboard Rohr-Idreco Dredger

Rohr-Idreco Dredge Systems completed a job recently that involved an electrical upgrade for a customer from Ohio who currently owns a Rohr-Idreco Overhead Gantry Clamshell Dredge, originally built in 1993. “They reached out to us and asked for our help upgrading the Motor Control Center (MCC) aboard

1 minutes read
  • LinkedIn
  • X
  • Email

Rohr-Idreco Dredge Systems completed a job recently that involved an electrical upgrade for a customer from Ohio who currently owns a Rohr-Idreco Overhead Gantry Clamshell Dredge, originally built in 1993.

“They reached out to us and asked for our help upgrading the Motor Control Center (MCC) aboard their floating clamshell dredge,” Rohr-Idreco said in its announcement.

“Our team of engineers were tasked with the challenge of redesigning a layout for the new MCC, and all while at the same time making sure that the Clamshell Dredge would also keep operating at maximum capacity.”

Once the planning and design phase of the project was completed, Rohr-Idreco team of Field Service Technicians began by removing the dredge’s older equipment from the electrical container and replacing it with newly upgraded equipment.

This new equipment included the motor control center, a new 480-volt, 2000-amp switchboard and 480-volt 400-amp panel board, new wiring from the existing PLC to the new MCC equipment, and additional programming where required.

Also per the customer’s request, the Rohr-Idreco crew installed new combination starters for each of the floating conveyors which would allow the capability of local control and disconnects on each conveyor.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago