Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Tellurian’s Driftwood LNG wins non-FTA export approval from DOE
News

May 3, 2019 · about 7 years ago

Tellurian’s Driftwood LNG wins non-FTA export approval from DOE

US LNG export project developer, Tellurian has been issued a liquefied natural gas export approval by the United States (U.S.) Department of Energy (DOE).

2 minutes read
  • LinkedIn
  • X
  • Email

US LNG export project developer, Tellurian has been issued a liquefied natural gas export approval by the United States (U.S.) Department of Energy (DOE).

The DOE’s Office of Fossil Energy has issued the long-term authorization for Tellurian’s Driftwood LNG to export domestically produced liquefied natural gas from its proposed export facility to non-free trade agreement countries.

U.S. Secretary of Energy Rick Perry said, “I am pleased to announce the order signed today authorizing Driftwood, owned by Tellurian, to export up to 3.88 billion cubic feet per day of natural gas as LNG, to any country that does not have a free trade agreement (FTA) with the United States.”

Secretary Perry added that the United States is now in its third consecutive year as a net exporter of natural gas, now exporting domestic LNG to 35 countries.

On April 18, 2019, Tellurian completed another regulatory milestone as the U.S. Federal Energy Regulatory Commission (FERC) issued an order granting authorization for Driftwood LNG, a proposed 27.6 million tonnes per annum (mtpa) liquefaction export facility near Lake Charles, Louisiana, and the associated Driftwood pipeline, a 96-mile proposed pipeline connecting to the facility.

According to the project’s estimated timeline, the financial investment decision is expected during the course of the year 2019 as well as the start of construction. First liquefied natural gas is expected to be produced at the project in 2023 with construction to be completed in 2026.

The first production phase is planned to have a 16.6 mtpa production capacity.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago