Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Santos: Barossa JV starts exclusive talks for Darwin LNG backfill gas supply
Clean Fuel

June 27, 2019 · about 7 years ago

Santos: Barossa JV starts exclusive talks for Darwin LNG backfill gas supply

Australian oil and gas company Santos informed that the Barossa joint venture has entered into exclusive negotiations with the Darwin LNG joint venture for the supply of backfill gas.

2 minutes read
  • LinkedIn
  • X
  • Email

Australian oil and gas company Santos informed that the Barossa joint venture has entered into exclusive negotiations with the Darwin LNG joint venture for the supply of backfill gas.

The arrangement gives the Barossa JV an exclusive commercial negotiation period to reach a processing services agreement as well as settle on a tariff in anticipation of a final investment decision early next year.

The Barossa project entered the front-end engineering and design (FEED) phase of development in April last year, and last month announced the contract to supply the subsea production system (SPS) and associated SPS installation support, the company said in a statement.

Santos managing director and CEO Kevin Gallagher said that this exclusivity confirms the status of the Barossa project as the lead candidate to supply backfill gas to Darwin LNG.

“Bids have also been received and are being evaluated for the FPSO, gas export pipeline and development drilling. We’re getting on with the job,” Gallagher said.

The Barossa gas field, 300 kilometers north of Darwin, sits within Santos’ Northern Australia portfolio, one of the company’s core long-life, natural gas asset regions.

The project area encompasses petroleum permit NT/RL5 and, with future phased development in the Caldita field to the south, petroleum permit NT/RL6.

Santos holds a 25 percent interest in the Barossa-Caldita joint venture along with partners ConocoPhillips (37.5 percent and operator) and SK E&S (37.5 percent).

Santos is also a joint venture partner in Darwin LNG with an 11.5 percent interest.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free