Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Gazprom hits first six-month gas production high since 2011
News

July 2, 2019 · about 7 years ago

Gazprom hits first six-month gas production high since 2011

Russian gas giant Gazprom has produced the largest amount of gas in the January–June periods since 2011.

2 minutes read
  • LinkedIn
  • X
  • Email

Russian gas giant Gazprom has produced the largest amount of gas in the January–June periods since 2011.

Gazprom said via its social media channels that, it produced an estimated 258.7 billion cubic meters of gas in the first six months of 2019.

According to the company, that was the largest amount produced in the January–June periods of the past eight years and a 2.3% increase, or 5.7 billion cubic meters, against the same period of 2018.

Gazprom added that the demand for natural gas from the national gas transmission system in the domestic market went down by 2% – or 2.6 billion cubic meters – in the first half of 2019.

However, the Russian firm did state that gas supplies grew by 0.7 billion cubic meters, or 7.4%, in June.

According to preliminary data, Gazprom’s gas deliveries to Europe from January through June 2019 amounted to 95.3 billion cubic meters, down by 5.9% compared to the first six months in the record year of 2018.

The company did increase its gas exports to several countries this year, specifically to Hungary by 67.2%, to Austria by 28.5%, to the Czech Republic by 48.2%, to Slovakia by 21.1%, to the Netherlands by 6.4%, and Italy and France by 1.5%.

Gazprom also provided an update for the construction of the Nord Stream 2 gas pipeline. The company stated that 1,501 kilometers of pipes, equalling around 61.2% of Nord Stream 2’s total length, have been laid in the Baltic Sea.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago