Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Energy World Corp. to boost gas supply to Sengkang power plant
News

July 8, 2019 · about 7 years ago

Energy World Corp. to boost gas supply to Sengkang power plant

LNG project developer Energy World Corporation (EWC) has started operation of two gas compressor units which would boost gas production and increase supply to the Sengkang power plant.

2 minutes read
  • LinkedIn
  • X
  • Email

LNG project developer Energy World Corporation (EWC) has started operation of two gas compressor units which would boost gas production and increase supply to the Sengkang power plant.

Through its unit Energy Equity Epic, EWC installed and began operation of two the two gas compressor units.

The compressors will boost gas production for the supply of gas to the Sengkang power plant currently owned and operated by PT Energi Sengkang (PTES), another unit of EWC.

With the operation of the compressors, the company will be in a position to deliver more gas to PTES which will then be able to supply more electricity when required.

As a result, PTES will be able to enter discussions of an extension of the power purchase agreement for the Sengkang power plant to supply electricity to the Indonesian national utility PT Perusahaan Listrik Negara beyond September 2022.

The current agreement is a long term take-or-pay power agreement that runs to 2022. According to the company, discussions for its extension have begun.

Installation of these two gas compressor units follows the signing of the Sengkang production sharing contract in December 2018. The contract’s expiry date has now been moved from October 2022 to October 2042.

With this extension in place, EWC can implement plans to supply gas for additional power generation, city gas, and provision of additional reserves for EWC’s Sengkang LNG facility.

As for the power plant itself, Sengkang involves a 315-megawatt gas-fired facility on the South Sulawesi coast in eastern Indonesia. The facility has an affiliated LNG production plant with an output of 2 million tonnes per annum.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago