Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Norway’s PSA orders Equinor to review Hammerfest LNG safety management
Clean Fuel

July 18, 2019 · about 7 years ago

Norway’s PSA orders Equinor to review Hammerfest LNG safety management

The Petroleum Safety Authority Norway (PSA) has ordered the compatriot energy company Equinor to review its own management of safety at the Hammerfest LNG plant on Melkøya Island.

2 minutes read
  • LinkedIn
  • X
  • Email

The Petroleum Safety Authority Norway (PSA) has ordered the compatriot energy company Equinor to review its own management of safety at the Hammerfest LNG plant on Melkøya Island.

PSA launched an investigation of an incident at the facility in March since the facility “has been operated over time with weakness in safety-critical equipment.”

Equinor shut down Hammerfest LNG on March 11, 2019, in order to correct impairments to a number of pressure safety valves (PSV). Heat trace cables and insulation were missing from 190 of these valves.

Equinor considered the overall position to be so serious and uncertain that a shutdown and correction was required.

The condition of these valves had been identified in earlier reviews conducted by Equinor, without the weaknesses being corrected, PSA said in its notice.

The watchdog found four irregularities related to management follow-up of safety at the plant, deficiencies in risk assessment of discoveries, inadequate correction following a hydrate discovery in a PSV and deficiencies in registering HSE incidents.

Furthermore, an improvement point related to inadequate capacity in the organization was identified, PSA said.

On the basis of its findings, PSA issued an order to Equinor to review its own management of safety at Hammerfest LNG plant and to implement the necessary measures to ensure that it is able to identify barriers which are impaired or non-functioning, assess the combination of impaired barriers, ensure that necessary compensatory measures are implemented and correct barriers which are non-functioning or impaired.

The deadline for compliance with the order is December 31, 2019, PSA said adding that it must verify the effect of the measures taken.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free