Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›PHOTO: McDermott’s Amazon vessel arrives in Rotterdam for conversion work
Fossil Energy

July 18, 2019 · about 7 years ago

PHOTO: McDermott’s Amazon vessel arrives in Rotterdam for conversion work

The Amazon construction vessel has arrived in Rotterdam to start its transformation into an ultra-deepwater J-Lay vessel.

2 minutes read
  • LinkedIn
  • X
  • Email

The McDermott-owned construction vessel Amazon has arrived in Rotterdam to start its transformation into an ultra-deepwater J-Lay vessel.

U.S. engineering company McDermott revealed its plans to convert the Amazon construction vessel to an ultra-deepwater J-Lay vessel in late July 2018 .

The Amazon is operated by McDermott under a long-term bareboat charter that started in 2017. The vessel is equipped with twin 400 metric ton cranes and accommodations for 200 personnel.

The modifications will consist of removing the existing tower and replacing it with a J-Lay system with 1,500 tonnes of dynamic top tension on the tower, which will enable large subsea structures and hex sections of pipelines from 4.5 to 24 inches to be installed.

The Amazon modifications will include an integrated multi-joint facility, where single joints will be welded to form hex joints. The 10,000 tonnes of existing cargo space onboard will remove the requirement for onshore facilities to produce the multi-joints, enhancing the mobility of the vessel and reducing reliance on shore bases for support.

Dutch-based Royal IHC has been selected to design and build the J-Lay system and would perform overall management of the modification project.

Initial engineering on the project began in October 2017 and transitioned into full engineering design in January 2018.

McDermott will pay for the modification project primarily through an increased bareboat charter rate over an extended 12-year term once the modifications are complete.

The conversion period that is expected to last ten months and redelivery to McDermott is expected in the summer of 2020.

Offshore Energy Today Staff

Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email .

Also, i f you’re interested in showcasing your company, product or technology on Offshore Energy Today please contact us via our advertising form where you can also see our media kit.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free