Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Subsea 7 Bags Offshore Wind Farm Cable Contract in UK
Operations & Maintenance

July 24, 2019 · about 7 years ago

Subsea 7 Bags Offshore Wind Farm Cable Contract in UK

Subsea 7’s Seaway 7 has secured a sizeable contract for the Hornsea Two offshore wind farm project by Optimus Wind, a subsidiary of the Ørsted Group, for the installation of the entire inner array grid cable system. According to Subsea 7, a sizeable contract is defined as being between USD 50 millio

1 minutes read
  • LinkedIn
  • X
  • Email

Subsea 7’s Seaway 7 has secured a sizeable contract for the Hornsea Two offshore wind farm project by Optimus Wind, a subsidiary of the Ørsted Group, for the installation of the entire inner array grid cable system.

According to Subsea 7, a sizeable contract is defined as being between USD 50 million and USD 150 million.

The Hornsea Two offshore wind farm project is located approximately 90 kilometers off the Yorkshire coast within the UK sector of the North Sea.

The offshore wind farm has a capacity of 1,386 MW and consists of 165 wind turbine generators, each with a capacity of 8.4 MW. The inner array grid cable system consists of 165 66kV copper-core submarine composite cables with a total length of more than 420km.

In addition to the submarine cable installation works, Seaway 7 will also undertake a pre-installation submarine cable route survey, perform pre-installation boulder clearance activities and execute post-lay trenching services.

Project engineering will begin immediately and offshore activities are due to start in 2021.

Steph McNeill , Subsea 7’s SVP Renewables and Heavy Lifting, said: “ We look forward to continuing our collaborative relationship with Ørsted to install the entire inner array grid cable system on the Hornsea Two offshore wind farm project. This award follows on from our reliable performance and successful completion of the installation activities for the Hornsea One offshore wind farm project earlier this year. “

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago