Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›First Formosa 1 Phase 2 Turbine Stands
News

July 25, 2019 · about 7 years ago

First Formosa 1 Phase 2 Turbine Stands

Jack-up vessel Seajacks Zaratan has installed the first of the 20 Siemens Gamesa 6MW wind turbines on the 120MW Formosa 1 Phase 2 wind farm in Taiwan. The project is located around six kilometers off the west coast of the Miaoli district in the Taiwan Strait, with water depths ranging between 15 and

1 minutes read
  • LinkedIn
  • X
  • Email

Jack-up vessel Seajacks Zaratan has installed the first of the 20 Siemens Gamesa 6MW wind turbines on the 120MW Formosa 1 Phase 2 wind farm in Taiwan.

The project is located around six kilometers off the west coast of the Miaoli district in the Taiwan Strait, with water depths ranging between 15 and 30m.

Seajacks Zaratan is loading the turbine components in the Taichung Port before transporting and installing them on monopile foundations .

The Formosa 1 Phase 2 offshore wind farm, an extension to the existing Formosa 1 Phase 1 , is expected to be fully built in the second half of the year and fully operational in 2020.

The wind farm is owned by Formosa I Wind Power Co. Ltd., a partnership of Orsted (35%), JERA (32.5%), Macquarie Capital (25%) and Swancor Holding (7.5%).

Photos: Ørsted

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago