Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Singapore’s Jurong Port Tank Terminals Ready for Operations
News

July 29, 2019 · about 7 years ago

Singapore’s Jurong Port Tank Terminals Ready for Operations

The terminal is expected to handle some seven million tons of clean petroleum product annually.

2 minutes read
  • LinkedIn
  • X
  • Email

Singapore’s Jurong Port Tank Terminals (JPTT) is ready to welcome customers after the completion of the first phase of works in Pulau Damar Laut in Jurong Port.

An opening ceremony on July 29 made 252,000 cbm of clean petroleum product storage capacity available to the market, according to Chee Hong Tat, Senior Minister of State, Ministry of Trade and Industry, and Ministry of Education.

The terminal is the result of a joint venture between Singapore’s Jurong Port and Germany-based tank terminal operator Oiltanking, who joined forces for the project in 2015.

Designed to store and handle both clean petroleum products and petrochemicals, the liquid bulk terminal will be supported by four berths with deep draft of up to 17.6 meters capable of handling up to 180,000 dwt tankers.

Construction of phase one started in May 2017 and, once phase 2 is completed, the terminal is expected to have total capacity of 550,000 cbm.

“The opening of Jurong Port Tank Terminals (JPTT) is an integral part of Jurong Port’s transformation to offer a port-centric solution for Jurong Island,” Chee Hong Tat said at the opening ceremony.

“The need for supporting infrastructure to manage the increasing demand in Asia for petroleum products created the need for JPTT,” Douglas van der Wiel, President of Oiltanking Asia Pacific, said.

“The terminals will be able to handle the demand from the region and help strengthen the integrated terminal network concept and overall value offering to the market.”

Another advertised benefit of the new terminal is the increased product transfer rate compared to older generation tank terminals. According to Jurong Port, ship loading and unloading will be up to 50% faster due to the use of large capacity pumps and jetty arms.

JPTT is expected to handle about seven million tons of clean petroleum product annually.

Image Courtesy: Jurong Port

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago