Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›McDermott, BHGE win subsea EPCI work on Ichthys LNG field
Equipment

July 31, 2019 · about 7 years ago

McDermott, BHGE win subsea EPCI work on Ichthys LNG field

McDermott and Baker Hughes have been awarded contracts for work on the Inpex-operated Ichthys LNG field development off the northwest coast of Western Australia.

1 minutes read
  • LinkedIn
  • X
  • Email

LNG contractor McDermott International and U.S.-based GE company Baker Hughes have been awarded contracts for work on the Inpex-operated Ichthys LNG field development off the northwest coast of Western Australia.

McDermott said on Tuesday that the contract, signed on July 25, was for the provision of a joint umbilical, risers, and flowlines (URF) and subsea production system (SPS) solutions for the project.

The solutions comprise a new subsea well gathering system (GS4), tied back to the existing central processing facility.

In addition to the GS4 scope, the award includes in-fill URF EPCI scope involving the development of new subsea wells tied-in to the existing gathering systems.

The two companies will lead the project from the joint project management and engineering office in Perth, Australia, while fabrication of the subsea URF equipment will be carried out at McDermott’s fabrication facility in Indonesia.

BHGE will deliver the SPS scope, including vertical christmas trees, associated production control systems, distribution equipment, and topside controls, as well as associated installation and commissioning support services. This follows an earlier award granted to BHGE including four christmas trees and associated SPS equipment for in-fill development.

According to McDermott, offshore installation of the URF and SPS equipment will begin in 2020 and will be completed in 2023. The field development will be carried out using McDermott’s DLV 2000 vessel.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago