Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Jan De Nul Installs All Formosa 1 Phase 2 Foundations
News

August 20, 2019 · about 7 years ago

Jan De Nul Installs All Formosa 1 Phase 2 Foundations

Jan De Nul has completed the installation of all 20 turbine foundations at the Formosa 1 Phase 2 offshore wind farm in Taiwan. Seaway Yudin began installing the foundations at the beginning of June at the project site some 6km off the west coast of the Miaoli district in the Taiwan Strait. Germany’s

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul has completed the installation of all 20 turbine foundations at the Formosa 1 Phase 2 offshore wind farm in Taiwan.

Seaway Yudin began installing the foundations at the beginning of June at the project site some 6km off the west coast of the Miaoli district in the Taiwan Strait.

Germany’s EEW SPC produced the monopiles and Thailand’s CUEL Limited manufactured the transition pieces.

According to Jan De Nul, the monopiles range from 752t to 1230t, with a maximum diameter of 8.4m and a length ranging from 60.1 to 79.5m, while the transition pieces weigh 465t and consist of five internal platforms, an external platform and boat landing.

To remind, the company won a contract for the design, procurement and installation of the turbine foundations, as well as scour protection and cables, in May last year.

The 120MW Formosa 1 Phase 2 will comprise 20 Siemens Gamesa 6MW turbines scheduled to be operational in 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago