Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Trianel Borkum Issues Turbine Maintenance Call
Operations & Maintenance

August 26, 2019 · about 7 years ago

Trianel Borkum Issues Turbine Maintenance Call

Trianel Windkraftwerk Borkum has issued a tender for the provision of turbine monitoring, repair, and maintenance services on the 200MW Trianel Windpark Borkum II offshore wind farm in the German North Sea. Currently under construction, the wind farm will comprise 32 Senvion 6.2M152 turbines install

1 minutes read
  • LinkedIn
  • X
  • Email

Trianel Windkraftwerk Borkum has issued a tender for the provision of turbine monitoring, repair, and maintenance services on the 200MW Trianel Windpark Borkum II offshore wind farm in the German North Sea.

Currently under construction, the wind farm will comprise 32 Senvion 6.2M152 turbines installed on monopile foundations at the site some 45 kilometres north of the island of Borkum in the German North Sea.

Jan de Nul’s jack-up Taillevent installed the first turbine at the site mid-August.

The contract covers the monitoring, repair, and maintenance of the wind turbine generators with a power upgrade type with a nominal output of 6,33MW, including the delivery and installation of all replacement parts and replacement components.

The long-term full-scope service is scheduled to start from six months after commissioning of the first wind turbine, with 1 February 2020 being the earliest starting point. The duration of the contract will be five, ten or fifteen years. A decision on the duration of the contract will be taken during the award procedure before querying final offer.

The main tasks of the scope are scheduled and unscheduled maintenance, inspection and repair of the components, documentation and reporting of the tasks and the turbine and all tasks which are necessary to keep the wind farm running safely and sustainably, including full logistic, base infrastructure, monitoring and control and spare part procurement.

Those interested have until 23 September to respond to this call.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago