Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Airborne to Supply TCP Flowlines for West African Project
Equipment

September 3, 2019 · about 7 years ago

Airborne to Supply TCP Flowlines for West African Project

Airborne Oil & Gas has secured a large contract from a supermajor through Oceaneering International to supply Thermoplastic Composite Pipe (TCP) flowlines for deployment in West Africa. TCP is a non-metallic, composite pipe which delivers high levels of corrosion and fatigue resistance and therefore

2 minutes read
  • LinkedIn
  • X
  • Email

Airborne Oil & Gas has secured a large contract from a supermajor through Oceaneering International to supply Thermoplastic Composite Pipe (TCP) flowlines for deployment in West Africa.

TCP is a non-metallic, composite pipe which delivers high levels of corrosion and fatigue resistance and therefore a significantly extended service life.

Under the contract in West Africa, the Airborne will provide a 4km, 7.1 inch ID, 160 bar design pressure TCP flowline for water injection replacing existing corroded flowlines in the field.

Martin van Onna , CCO at Airborne Oil & Gas said: “This is an important milestone in our company’s history as we believe it to be the first TCP Flowline to be installed in West Africa, marking the breakthrough of TCP technology in the subsea market in this region. From now on, any asset director, country manager, buyer or engineer can simply choose a ‘no corrosion’ solution to be manufactured, installed and deployed quickly and cost effectively.”

The total installed cost of TCP has proved to offer significant benefits to the operator’s pipeline replacement projects, particularly for water injection lines which often suffer from corrosion.

Paul McCafferty , vice president Europe & Africa at Airborne Oil & Gas added : “The lightweight nature of TCP means that our client is able to install the flowlines from its existing field support vessel, without the need to bring in a dedicated construction vessel. This provides an estimated 40% reduction in the total cost of installation.

“Combined with the low operating costs associated with using the non-corrosive TCP flowline, this demonstrates the significant potential of the use of TCP in Africa and other brownfield markets around the globe.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago