Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Thessaloniki Port Authority Picks Expansion Project Manager
News

September 11, 2019 · about 6 years ago

Thessaloniki Port Authority Picks Expansion Project Manager

Thessaloniki is spending EUR 180 million on port upgrades.

1 minutes read
  • LinkedIn
  • X
  • Email

Greece’s Thessaloniki Port Authority (THPA) has contracted Hill International to provide design and project management services for the planned expansion of infrastructure at the port’s Pier 6.

As leader of a consortium including Rogan Associates SA, Hill International will oversee the construction of one new additional quay wall with a minimum continuous length of 440 meters, out of which at least 400 meters provide a minimum draft of 17.60 meters.

Additional yard area will also be constructed and the navigation channel and ship maneuvering area will be dredged to a minimum water depth of 17.60 meters.

The overall duration of the project is 46 months and services to be provided by the consortium include the update and preparation of the detailed design, management of the construction procurement tender, and project management/supervision during construction.

Following an international privatization process that was concluded in March 2018, the Hellenic Republic Asset Development Fund entered into a shares purchase agreement with a group of international investors (South Europe Gateway Thessaloniki (SEGT) Limited) for the acquisition of 67% in the share capital of THPA.

Pursuant to the terms of the relevant concession agreement, THPA is required to implement a minimum of EUR 180 million (USD 203 million) capital expenditure program to upgrade the port. The main project relates to the expansion of the marine works infrastructure of Pier 6.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago