Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Oceaneering to Supply Umbilicals for Project in Bay of Bengal
Equipment

September 18, 2019 · about 6 years ago

Oceaneering to Supply Umbilicals for Project in Bay of Bengal

Oceaneering International has received subsea umbilical control systems supply contracts by Baker Hughes, a GE company (BHGE), and partner in the consortium for the Oil & Natural Gas Corporation of India’s (ONGC) KG‑DWN 98/2 deepwater field development in the Bay of Bengal. Oceaneering’s scope compr

2 minutes read
  • LinkedIn
  • X
  • Email

Oceaneering International has received subsea umbilical control systems supply contracts by Baker Hughes, a GE company (BHGE), and partner in the consortium for the Oil & Natural Gas Corporation of India’s (ONGC) KG‑DWN 98/2 deepwater field development in the Bay of Bengal.

Oceaneering’s scope comprises the supply of the subsea umbilical control systems to allow production of gas from fields U and R, and oil from fields A, P, and M.

The contract award includes design and manufacture of 44 electro-hydraulic control umbilicals, totaling approximately 73 miles (118 kilometers) in length, delivered on a combination of reels and carousels.

Manufacture of the umbilicals is scheduled to occur at Oceaneering’s facility in Rosyth, Scotland and is expected to start in the third quarter of 2019 and be completed in the first quarter of 2021.

In March 2019, Oceaneering was awarded a separate contract to supply a subsea, steel tube control umbilical and associated hardware to facilitate early gas delivery for the project, which is anticipated in fourth quarter 2019.

Manufacture of the umbilical measuring 8.2 miles (13.2 kilometers) and associated hardware is in progress at Oceaneering’s facility in Panama City, Florida.

Rod Larson , president and chief executive officer, said: “Securing these significant awards is gratifying, and we are pleased with our status as a preferred provider of umbilical systems to the consortium through BHGE. We look forward to participation in forthcoming projects in the Bay of Bengal region, where deepwater opportunities hold vast potential for the region’s energy needs.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago