Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›OWC Carries Out Milestone Leg Penetration Assessment
Offshore Wind

September 30, 2019 · about 7 years ago

OWC Carries Out Milestone Leg Penetration Assessment

Offshore Wind Consultants (OWC), with sister company AqualisBraemar, has completed its 1,000th leg penetration assessment (LPA), which is conducted before deploying jack-up vessels at a project. LPA is an analytical study of soil conditions to predict the anticipated leg penetrations and potential r

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore Wind Consultants (OWC), with sister company AqualisBraemar , has completed its 1,000th leg penetration assessment (LPA), which is conducted before deploying jack-up vessels at a project.

LPA is an analytical study of soil conditions to predict the anticipated leg penetrations and potential risks to jack-up vessels during their offshore deployment, mainly based on the ground conditions at the project site.

According to OWC, LPA is a tool for jack-up owners and field operators to work out the installation plan, and is an important part of the site-specific assessment to understand the structural integrity and capability for vessels installed at specific sites.

“The significance of 1,000 LPAs is more than just a number, it is something wind farm developers can benefit from in many ways,” said Zheming Li , Principal Consultant at OWC.

“Based on the corresponding installation record data, OWC has developed an extensive database and in-depth knowledge on leg penetration predictions at different sites with challenging ground conditions. This allows us to repeatedly optimise LPA services to provide high-quality prediction and to mitigate relevant risks effectively.”

OWC emphasized that a wrong leg penetration analysis could have serious consequences, such as structural failures, instability or leg damages to the jack-up unit, and could even lead to personnel injuries or fatalities.

From a commercial perspective, a wrong LPA could have a detrimental impact on project schedule due to delayed jack-up deployment as a result of unexpected installation difficulties, the company concluded.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free