Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Ramboll to Conduct Thor Environmental Study
Project & Tenders

November 21, 2019 · about 6 years ago

Ramboll to Conduct Thor Environmental Study

Energinet has contracted Ramboll to carry out the strategic environmental assessment (SEA) and environmental investigations for the Thor offshore wind project in Denmark. Ramboll will provide a SEA of the plan for the Thor project, as well as a number of surveys and technical reports on specific env

1 minutes read
  • LinkedIn
  • X
  • Email

Energinet has contracted Ramboll to carry out the strategic environmental assessment (SEA) and environmental investigations for the Thor offshore wind project in Denmark.

Ramboll will provide a SEA of the plan for the Thor project, as well as a number of surveys and technical reports on specific environmental and other themes.

These are primarily meant as background reports for an expected later environmental impact assessment (EIA) of the actual project to be decided at a later stage by the future concession owner.

The technical reports will address potential impacts during construction, operation and decommissioning phases, potential cumulative and transboundary impacts, proposals for measures to mitigate adverse impacts, analysis of data gaps and uncertainties of relevance for the assessments and proposals for monitoring programs.

Energinet issued the tender seeking a consultant to provide the SEA in July.

Thor is the first of three 800MW offshore wind farms to be constructed in Danish waters before 2030, with an option for the developer to boost the wind farm’s capacity to up to 1,000MW.

The project will be built off Nissum Fjord in the North Sea and is expected to feature 13-15MW turbines set to be operational between 2024 and 2027. Energinet commenced the feasibility studies for the wind farm in May.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago