Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Helix Nets Neart na Gaoithe Wind Farm Work
Operations & Maintenance

December 19, 2019 · about 6 years ago

Helix Nets Neart na Gaoithe Wind Farm Work

Helix Robotics Solutions has been awarded three scopes of work for the Neart na Gaoithe (NnG) offshore wind farm project by EDF Renewables. Gary Aylmer, Helix Robotics Solutions vice president – Europe and West Africa, said: “This is a significant award for Helix as it represents an expansion to our

2 minutes read
  • LinkedIn
  • X
  • Email

Helix Robotics Solutions has been awarded three scopes of work for the Neart na Gaoithe (NnG) offshore wind farm project by EDF Renewables.

Gary Aylmer , Helix Robotics Solutions vice president – Europe and West Africa, said: “This is a significant award for Helix as it represents an expansion to our current renewable offering – to better support the development of the UK’s offshore renewable energy sector. As a company based in Scotland, we are immensely proud to have been selected by EDF Renewables to perform the work on a Scottish offshore wind farm and look forward to working with them and the local supply chain in delivering this significant project.”

Helix Robotics Solutions’ scope of work consists of three phases for the project which are expected to start imminently.

In the Phase I , Helix will mobilize a XLS Work class ROV onboard a chartered vessel to conduct the investigation of the potential unexploded ordnances (UXOs) during a period of three months.

During the Phase II , Helix will detonate identified UXOs utilizing the same vessel and XLS ROV. The duration of work will be determined by number of UXOs that are found.

In the Phase III, using a boulder grab tool onboard a chartered vessel of opportunity, Helix will relocate and clear the designated project path of boulders. The expected duration of this phase is in excess of six months.

The project will be managed and overseen by the core team in Aberdeen, supported by specialist subcontractors from within Scotland and the wider UK:

The NnG offshore wind farm will be located 15.5 km off the Fife coast and will cover an area of approximately 105 km2. The project has the potential to generate 450MW of renewable energy, which is enough power to supply around 375,000 Scottish homes, and to offset over 400,000 tonnes of CO2 emissions each year.

Offshore construction is scheduled to start in June 2020 and full commissioning is expected to complete in 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago