Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Annova LNG secures feed gas supply with Enbridge deal
News

January 23, 2020 · about 6 years ago

Annova LNG secures feed gas supply with Enbridge deal

Annova LNG signed a precedent agreement with Enbridge’s Valley Crossing Pipeline, providing transportation for Annova LNG’s total natural gas requirements at its 6.5 MTPA liquefied natural gas (LNG) facility in Brownsville, Texas.

1 minutes read
  • LinkedIn
  • X
  • Email
Annova LNG secures feed gas supply with Enbridge deal

Image courtesy of Annova

Annova LNG signed a precedent agreement with Enbridge’s Valley Crossing Pipeline, providing transportation for Annova LNG’s total natural gas requirements at its 6.5 MTPA liquefied natural gas (LNG) facility in Brownsville, Texas.

Under the precedent agreement, the existing Valley Crossing Pipeline from Agua Dulce to Brownsville, Texas will be expanded along with the construction of an approximately nine-mile lateral connecting VCP to Annova LNG’s facility, Annova LNG said in its statement.

“Annova LNG’s firm transportation arrangements will ensure security of supply and access to the most diversified, low-cost feed gas of any of the U.S. LNG facilities,” said Omar Khayum , CEO, Annova LNG.

The LNG facility also plans to utilize electric-driven compressor engines and source its electricity through 100 percent carbon-free renewable energy resources.

Signed on January 22, the precedent agreement provides for the execution of a 20-year firm transportation service agreement that will access multiple receipt points with major pipelines in the Agua Dulce area providing gas supply diversity for Annova’s feed gas requirements.

Additional terms of the agreement were not disclosed.

Annova LNG is scheduled to commence commissioning in 2024 and commercial operations in early 2025.

In October 2018, Annova LNG said that Black & Veatch and Kiewit invested in the facility and were awarded the engineering, procurement and construction (EPC) contract on a joint basis.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago