Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Pacific Osprey Gearing Up for Giant Wind Turbines
Offshore Wind

January 24, 2020 · about 6 years ago

Pacific Osprey Gearing Up for Giant Wind Turbines

Swire Blue Ocean (SBO) has contracted Blue Water Shipping to transport Pacific Osprey’s new crane boom from NOV’s manufacturing yard in China to Denmark. The boom was loaded onto SAL’s M/V Wiebke on 21 January and left the yard the day after. The vessel is expected to reach Denmark around 1 March. S

2 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
PPF; Source: ConocoPhillips

Swire Blue Ocean (SBO) has contracted Blue Water Shipping to transport Pacific Osprey’s new crane boom from NOV’s manufacturing yard in China to Denmark.

The boom was loaded onto SAL’s M/V Wiebke on 21 January and left the yard the day after. The vessel is expected to reach Denmark around 1 March. SBO expects Pacific Osprey to be back in service by 1 May 2020.

“This is an important milestone for Swire Blue Ocean. The transportation of the crane boom to Denmark rewards months of hard work spent developing a new crane boom design with capacity for future wind turbines. We have all been looking forward to this moment and are very excited about what is coming soon,” said Kim Tribler , Head of Marine Operations, SBO.

Pacific Osprey is a 2012 built, self-elevating wind farm installation vessel, originally fitted with a 1,200 MT main crane @ 31 m radius – 97 m hook height above deck – targeted for both foundation and wind turbine installations.

The vessel’s new crane boom will have a 1,200 MT main crane @ 31 m radius – 132 m hook height above deck; 700 MT @ 50 m radius – 125 m hook height above deck; and 115 m boom length – approx. 30 m gain in main hook height.

With its upgraded crane boom, Pacific Osprey will be capable of handling four SG 10.0-193 DD wind turbines per loadout, five MHI Vestas V164-10.0 MW or V174-9.5 MW units, and three GE Haliade-X 12MW turbines per loadout.

Earlier this month, SBO and Vattenfall signed the final contract under which Pacific Osprey will transport and install up to 140 of Siemens Gamesa’s SG 11.0-193 DD wind turbines on the Hollandse Kust Zuid 1-4 wind farms in the Netherlands.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free