Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Ryder Geotechnical Delivers for Kriegers Flak
News

February 3, 2020 · about 6 years ago

Ryder Geotechnical Delivers for Kriegers Flak

Ryder Geotechnical Limited has supported Jan De Nul with the delivery of a spudcan boulder interaction study for the 605MW Kriegers Flak offshore wind farm in the Danish Baltic Sea. The study quantified the risk of surface and buried boulders to the Vole au vent jack-up installation vessel, thereby,

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

Ryder Geotechnical Limited has supported Jan De Nul with the delivery of a spudcan boulder interaction study for the 605MW Kriegers Flak offshore wind farm in the Danish Baltic Sea.

The study quantified the risk of surface and buried boulders to the Vole au vent jack-up installation vessel, thereby, enabling the boulder removal requirements to be determined, removing unnecessary conservatism, reducing offshore exposure hours and reducing seabed disturbance, Tekmar Group, Ryder Geotechnical’s parent company, said.

The key to the success of the project was the development and implementation of the boulder removal criteria specific to the site conditions and spudcan make-up, criteria developed by Ryder, according to Tekmar. This enabled the boulder removal requirements to be reduced where the ground conditions were less onerous and the risk of spudcan damage could be managed.

Tekmar Group’s, Tekmar Energy, has recently secured a contract for the supply of 150 TekLink® cable protection systems and patented sealed hang of clamps for Vattenfall’s Kriegers Flak wind farm.

Kriegers Flak will comprise 72 Siemens Gamesa 8.4MW wind turbines installed 15-40 kilometres off Denmark’s east coast.

Vattenfall plans to start offshore construction as soon as the Danish Energy Agency grants the final approval for the project, which is expected in early 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago