Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›UPTIME International wins Greater Tortue Ahmeyim LNG job
Clean Fuel

February 4, 2020 · about 6 years ago

UPTIME International wins Greater Tortue Ahmeyim LNG job

Norwegian offshore service provider UPTIME International has been awarded a contract from Eiffage Génie Civil Marine for the supply of access solutions for the LNG Hub Marine Terminal for BP’s Greater Tortue Ahmeyim LNG project offshore Mauritania and Senegal.

1 minutes read
  • LinkedIn
  • X
  • Email
UPTIME International wins Greater Tortue Ahmeyim LNG job
Image courtesy of EIFFAGE

Norwegian offshore service provider UPTIME International has been awarded a contract from Eiffage Génie Civil Marine for the supply of access solutions for the LNG Hub Marine Terminal for BP’s Greater Tortue Ahmeyim LNG project offshore Mauritania and Senegal.

UPTIME’s scope of work includes engineering, design and supply of access solutions between the LNG hub terminal and the FLNG vessel and consists of two large motion compensated gangways, pedestals and stair-towers, the company said in its statement.

The project will commence immediately with a project duration of approximately 12 months.

The Greater Tortue Ahmeyim project located at the maritime border of Senegal and Mauritania has been sanctioned by BP and its partner Kosmos Energy in December 2018.

The Greater Tortue Ahmeyim project will produce gas from an ultra-deepwater subsea system and mid-water floating production, storage and offloading (FPSO) vessel, which will process the gas, removing heavier hydrocarbon components. The gas will then be transferred to a floating liquefied natural gas (FLNG) facility at a nearshore hub.

The FLNG facility is designed to provide circa 2.5 million tonnes of LNG per annum on average, with the total gas resources in the field estimated to be around 15 trillion cubic feet, with first gas expected in 2022.

BP Gas Marketing has been selected as the sole buyer for the investor partners’ LNG offtake for Tortue Phase 1.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free