Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Israel limits natural gas production at Leviathan due to pipeline fault
Fossil Energy

February 14, 2020 · about 6 years ago

Israel limits natural gas production at Leviathan due to pipeline fault

The Government of Israel has limited the natural gas production from its largest natural gas field – Leviathan – to about 60 percent of its production capacity due to a pipeline fault.

2 minutes read
  • LinkedIn
  • X
  • Email
Israel limits natural gas production at Leviathan due to pipeline fault
Leviathan platform; Image source: Noble Energy

The Government of Israel has limited the natural gas production from its largest natural gas field – Leviathan – to about 60 percent of its production capacity due to a pipeline fault.

Leviathan platform; Image source: Noble Energy

The operator of the Leviathan field, Noble Energy, was told that full production from the wells would not be possible until an investigation and necessary tests were completed.

Leviathan, located in the Mediterranean Sea, has four wells with a daily production capacity of about 300 million cubic feet each.

According to the Ministry, a fault was discovered in pipeline segments located close to one of the wells.

The fault is described as a vibration detected by an underwater robot. In order to minimize vibration, natural gas production from the wells has been reduced.

The ministry also stated that the fault did not cause any pollution of seawater, nor damage to the rig and engineering facilities.

The field, which started flowing natural gas in December 2019, was discovered in 2010 and contains about 500 billion cubic meters of natural gas.

It is worth reminding that Noble Energy started exporting gas from the Leviathan field to Egypt last month .

Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email .

Also, i f you’re interested in showcasing your company, product, or technology on Offshore Energy Today, please contact us via our advertising form where you can also see our media kit.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free