Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Fugro in Marine Survey Contract with Inpex
Operations & Maintenance

March 5, 2020 · about 6 years ago

Fugro in Marine Survey Contract with Inpex

Fugro has secured a large marine survey contract from INPEX Masela, a subsidiary of INPEX CORPORATION, for the Abadi liquefied natural gas (LNG) project in Indonesia. Fugro will perform geophysical and geotechnical surveys and the associated studies needed to support front-end engineering design (FE

1 minutes read
  • LinkedIn
  • X
  • Email
Fugro in Marine Survey Contract with Inpex

Fugro has secured a large marine survey contract from INPEX Masela, a subsidiary of INPEX CORPORATION, for the Abadi liquefied natural gas (LNG) project in Indonesia.

Fugro will perform geophysical and geotechnical surveys and the associated studies needed to support front-end engineering design (FEED) for offshore production facilities and the submarine pipeline to the onshore LNG terminal.

Geo-data will be acquired using Fugro’s deepwater autonomous underwater vehicle (AUV) Echo Surveyor and its robotic seafloor drill, Seafloor Drill 2, deployed from Indonesian support vessels.

The Abadi LNG project is based on an onshore LNG development scheme that INPEX as the operator is preparing for development in partnership with Shell in Masela block, offshore Indonesia. The project will produce a total output of natural gas (LNG equivalent) of 10.5 million tons per year and up to approximately 35,000 barrels of condensate per day.

“ We are pleased to once again support INPEX, a company that understands the value provided by our Geo-data expertise ,” said Jerry Paisley , Fugro’s business line director, Asia Pacific Region.

“This is particularly valid for the development of the Abadi LNG project, where overcoming engineering challenges including slope stability, regional seismicity, subsea faulting and carbonate sediments will require a collaborative and informed approach at each stage of the Geo-data acquisition, analysis and advice. Fugro looks forward to delivering a successful outcome on the Abadi LNG project.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago