Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›FPSO hull arrives in Brazil for module integration
FPSO

March 18, 2020 · about 6 years ago

FPSO hull arrives in Brazil for module integration

Petrobras has informed that the hull of the FPSO P-71 has arrived from China to a Brazilian shipyard for integration with other modules.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO hull arrives in Brazil for module integration

Brazilian oil and gas company Petrobras has informed that the hull of the FPSO P-71 has arrived from China at a Brazilian shipyard for integration with other modules.

Petrobras said on Tuesday that the hull of the FPSO P-71 had arrived in Espírito Santo on March 16. The trip began on December 12, 2019, when the hull left the CIMC Raffles shipyard in China, heading for Brazil.

The hull will be integrated with other modules at Sembcorp Marine’s Jurong Aracruz Shipyard (EJA).

In addition to the completion of the construction of nine modules, another 19 modules will also be integrated and commissioned to the hull. These activities are expected to be completed in the second half of 2021.

The P-71 is the sixth unit from a series designed to operate in the pre-salt layer, with a capacity of 150,000 barrels of oil per day.

Petrobras noted that, due to the coronavirus outbreak, the hull was transported without the crew on board. Regarding the tugboats that participated in the operation, there was no change in the crew during the entire trip.

It is also worth reminding that the Jurong Aracruz Shipyard in September 2019 completed another FPSO project for Petrobras . The P-68 FPSO left the shipyard last September to be deployed to the ultra-deepwater Berbigão and Sururu fields in Brazil’s Santos Basin.

Petrobras awarded a contract for the P-68 and P-71 FPSOs to the Jurong Aracruz Shipyard in August 2012. The contract was for the construction of a total of 8 modules and module integration works for the two FPSOs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free