Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›FPSO hull arrives in Brazil for module integration
Infrastructure

March 18, 2020 · about 6 years ago

FPSO hull arrives in Brazil for module integration

Petrobras has informed that the hull of the FPSO P-71 has arrived from China to a Brazilian shipyard for integration with other modules.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO hull arrives in Brazil for module integration

Brazilian oil and gas company Petrobras has informed that the hull of the FPSO P-71 has arrived from China at a Brazilian shipyard for integration with other modules.

Petrobras said on Tuesday that the hull of the FPSO P-71 had arrived in Espírito Santo on March 16. The trip began on December 12, 2019, when the hull left the CIMC Raffles shipyard in China, heading for Brazil.

The hull will be integrated with other modules at Sembcorp Marine’s Jurong Aracruz Shipyard (EJA).

In addition to the completion of the construction of nine modules, another 19 modules will also be integrated and commissioned to the hull. These activities are expected to be completed in the second half of 2021.

The P-71 is the sixth unit from a series designed to operate in the pre-salt layer, with a capacity of 150,000 barrels of oil per day.

Petrobras noted that, due to the coronavirus outbreak, the hull was transported without the crew on board. Regarding the tugboats that participated in the operation, there was no change in the crew during the entire trip.

It is also worth reminding that the Jurong Aracruz Shipyard in September 2019 completed another FPSO project for Petrobras . The P-68 FPSO left the shipyard last September to be deployed to the ultra-deepwater Berbigão and Sururu fields in Brazil’s Santos Basin.

Petrobras awarded a contract for the P-68 and P-71 FPSOs to the Jurong Aracruz Shipyard in August 2012. The contract was for the construction of a total of 8 modules and module integration works for the two FPSOs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago