Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›Petrobras firms up deals for Marlim 2 FPSO with Yinson
FPSO

March 30, 2020 · about 6 years ago

Petrobras firms up deals for Marlim 2 FPSO with Yinson

Malaysian FPSO provider Yinson has signed contracts with Petrobras for the delivery, operation, and maintenance of the Marlim 2 FPSO.

2 minutes read
  • LinkedIn
  • X
  • Email
Petrobras firms up deals for Marlim 2 FPSO with Yinson

Malaysian FPSO provider Yinson has signed contracts with Petrobras for the delivery, operation, and maintenance of the Marlim 2 FPSO.

Yinson won two letters of intent from Petrobras in October 2019 for the charter and operation of the Marlim 2 FPSO for the Marlim revitalization project in Brazil.

The company said at the time that the estimated aggregate value of the contracts was equivalent to $5.4 billion. The contract period is for 25 years from the date of the final acceptance.

FPSO Marlim 2 will be Yinson’s first vessel to operate in Brazilian waters.

Yinson said last week that its subsidiaries Yinson Production Pte Ltd, Yinson Boronia Production B.V., and Yinson Boronia Serviços de Operação Ltda, had now entered into definitive contracts with Petrobras for the Marlim 2, under the same terms as stated in the letters of intent from October 2019.

According to the FPSO provider, the date of final acceptance under the contracts is expected in the first quarter of 2023.

On Monday, Yinson added that there would be no extension of the term of the charter under the contracts.

As for the FPSO, Marlim 2 will be installed some 150 kilometers off the Brazilian coast, in a water depth of 930 meters. It will have the capacity to process up to 70,000 bpd of oil and 4 million cbm of natural gas.

Also worth noting, Yinson and Sumitomo Corporation announced their intention to collaborate on the Marlim revitalization project back in March 2019 in the event of a successful bid by Yinson.

The other FPSO for the Marlim revitalization project is the Marlim 1. Japan’s MODEC received a letter of intent for the supply, charter, and operations of an FPSO vessel for the project from Petrobras back in October 2019. First oil from Marlim 1 is planned for 2022.

Marlim 1 will be MODEC’s 16th project for Petrobras and will be chartered for 25 years. The 15th FPSO order for MODEC from Petrobras was for Búzios 5 field. It was ordered back in June 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOBusiness & FinanceInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free