UK’s Ineos has decided to postpone its planned shutdown of the Forties pipeline system until the spring of 2021.
The Forties Pipeline System (FPS) is a 100% Ineos-owned integrated oil and gas liquid transportation and processing system with a nominal capacity in excess of one million barrels per day serving the central area of the North Sea. Oil and gas liquids from over 50 offshore fields and St Fergus flow through pipelines into the FPS.
