Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Australian regulator accepts Beach Energy’s plan for Trefoil seabed assessment
Authorities & Government

April 30, 2020 · about 6 years ago

Australian regulator accepts Beach Energy’s plan for Trefoil seabed assessment

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has approved Beach Energy’s plan for a geophysical and geotechnical seabed assessment on the Trefoil offshore field.

2 minutes read
  • LinkedIn
  • X
  • Email
Australian coast; Source: Pixabay

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has approved Beach Energy’s plan for a geophysical and geotechnical seabed assessment on the Trefoil field offshore Australia.

According to NOPSEMA, Beach Energy submitted the plan on 25 February 2020. It was approved on Wednesday, 29 April.

In the plan, Beach Energy proposed to undertake a geophysical and geotechnical seabed assessment within the Rockhopper (T/RL3), Trefoil (T/RL2), and Yolla (T/L1) permits and open acreage within the Bass Strait.

The seabed assessment operational area is approximately 126 kilometres from the coast of Victoria and 94 kilometres from Tasmania.

The seabed assessment consists of surveys which will evaluate the potential development of the Trefoil and Rockhopper fields and is required to determine the placement of a rig for the future drilling of a well within the Trefoil field and for surveying a potential pipeline tieback route to the Yolla platform.

The geophysical and geotechnical surveys will potentially be undertaken separately and take up to 25 and 55 days, respectively, between April 2020 and 31 December 2021. Timings of the surveys are contingent on the availability of suitable vessels, weather, and the receipt of required environmental approvals.

NOPSEMA said that the seabed assessment consists of a geophysical survey which will collect bathymetry data and detect seabed hazards. The survey will be done using a multibeam echo sounder, side-scan sonar, sub-bottom profiler, and a magnetometer.

The geotechnical survey will collect information on the properties of the seabed and the underlying shallow sediments by borehole sampling, core sampling, and performing a piezo cone penetrometer test.

The seabed assessment area will cover a 6×6 kilometre area over the proposed well location and a 1×40 kilometre corridor from the proposed well location to the Yolla platform and will cover a total area of 68.32 square kilometres.

As the well location has not yet been finalised the seabed assessment area will be within the operational area which covers 552 square kilometres.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentRegulation & PolicyRules & Regulation

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago
Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago