Heerema’s Sleipnir, the world’s largest semi-submersible crane vessel, has transported and installed the Nova topside module on the Gjøa platform in the North Sea.
As previously reported, Sleipnir picked up the 740mT module from a barge outside Stavanger, Norway. From there, the vessel transported the module to Neptune Energy’s operated Gjøa platform and completed the installation within three hours.
